It’s quite common when speaking to contract Planners for someone to have a figure in mind.

“My rate is £X per day.”

And understandably, when they move to the next contract, they generally want to maintain that rate or improve on it.

At Infraspec, we’ve seen Planning & Project Controls rates in some sectors stay at a similar level for a long time, while in others we’ve seen significant increases.

But should the rate really be dictated by the job title?

Why Senior Planner Day Rates Can Vary Between Projects

Job title alone doesn’t always reflect the scope of a Senior Planner’s assignment.

The condition of the programme, project complexity, contractual exposure, level of responsibility, location, travel requirements and the specific outcome the Planner has been engaged to deliver can all influence what represents an appropriate contract rate.

A Senior Planner joining a well-run project with a stable programme, good information and a clearly defined scope could have a very different role to another Senior Planner joining a project that is already under significant programme pressure or, in some instances, inheriting a complete car crash!

The second role might involve taking apart a programme that is no longer credible, challenging logic and progress, understanding what is genuinely driving the critical path and helping to establish a realistic route to completion.

What Can Make a Senior Planning Role More Complex?

On different projects, the role could involve:

  • Building or rebaselining a complex programme
  • Managing multiple contractor and subcontractor interfaces
  • Assessing the programme impact of NEC compensation events
  • Supporting delay analysis or an Extension of Time position
  • Integrating design, procurement, construction and commissioning programmes
  • Working with Risk on QSRA and schedule uncertainty
  • Producing programme information that will be scrutinised at senior project or client level

Both roles could be advertised as Senior Planner, but the complexity, pressure, commercial exposure and ultimately the value being delivered can be completely different.

It’s why I think contract rates need to be looked at in the round.

What Should a Contractor Consider When Setting a Day Rate?

There is obviously a market rate for Planning and Project Controls professionals, but there are other considerations:

  • How difficult is the project or programme?
  • What are you actually being brought in to achieve?
  • How much responsibility are you taking on?
  • Is it a stable inherited programme or programme recovery?
  • What are the travel expectations?
  • Is it the type of project and work you actually want on your CV?
  • What will the contract deliver financially across the whole year?
  • What value could your experience bring to the project?

Sometimes a higher day rate for a difficult recovery role represents very good value to the client.

Equally, a slightly lower rate for a long-term contract, close to home, on a good project with a strong team could represent better value to the contractor.

So perhaps the question shouldn’t always be:

“What’s your day rate?”

Perhaps it should be:

“What does this particular scope warrant?”

Interested to hear how contract Planners and Project Controls professionals look at this.

Do you have one day rate, or does it change depending on the project, scope and level of responsibility?


Frequently Asked Questions

Do Senior Planner contract rates vary by project?

They can. Market conditions are obviously important, but the scope and complexity of the assignment, level of responsibility, programme condition, location and specialist expertise required can all influence what represents an appropriate rate.

Does programme recovery command a higher Planner day rate?

It can. A Senior Planner brought in to rebaseline or help recover a distressed programme may be taking on a materially different scope and level of responsibility from someone maintaining an established and stable programme.

Can NEC experience affect a Planner’s contract rate?

It can be a significant requirement on NEC projects, particularly where the Planner is expected to assess programme impacts arising from compensation events, change and potential delay.

Should contractors consider more than the headline day rate?

Absolutely. Contract duration, travel, location, project experience, the nature of the work and potential earnings across the whole assignment can all be relevant when assessing whether an opportunity represents good value.


Looking for your next Planning or Project Controls opportunity?

Infraspec specialises in recruitment across Planning, Project Controls, Risk, Cost and Change within major infrastructure and construction programmes.

View our latest Planning and Project Controls opportunities or speak to the Infraspec team about the current contract market.